Service: Design
Key Project Elements
Project Overview
TAFE wanted to relocate their existing Dental Training facilities at Nedlands to their own TAFE buildings in Leederville.
The existing building was previously used as offices and lecture rooms, which were all gutted to create the new training centre.
The fitout included:
The project involved the following key items:
Our Approach
This project involved highly technical aspects that had to be extracted from Lecturers and TAFE staff who were largely unfamiliar with construction and fit outs. Extensive coordination sessions between the design team and these staff were carried through the design process as well as during construction to ensure that the result was in line with TAFE’s requirements and expectations.
The project was also conducted during the COVID period and our liaison with suppliers and contractors ensured that equipment and delivery met the required construction program.
The Benefits
We delivered this highly technical project largely during a pandemic within program for the staff and students to relocate and commence training at the second semester of 2023.
We collaborated closely with the lecturers, TAFE management, facilities manager, project manager, architects and contractors to ensure that the services requirements associated with the Dental Training facility were provided to the expected requirements.
The builder was chosen as finalist in the 2023 Master Builders Western Australia (MBAWA) Excellence in Construction Awards.